H3c-technologies H3C SecPath F5000-A5 Firewall User Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 121
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
11
You have read "Preparing for installation" carefully and the installation site meets all the
requirements.
A 19-inch rack is ready for use.
The rack is sturdy and securely grounded.
There is sufficient clearance around the rack for heat dissipation and installation.
No debris exists inside or around the rack.
Choose a correct rack mounting position for the firewall. Make sure the heaviest device is placed at
the bottom of the rack.
The firewall is ready for installation and has been carried to a place near the installation site and
convenient for moving.
Installing the firewall in a 19-inch rack
To install the F5000-A5 in a 19-inch rack, mounting brackets and a rack shelf are needed.
Installing cage nuts to the rack
1. Determine where to install the firewall in the rack, and then install a rack shelf to the rack.
2. As shown in Figure 4, mark the position
s of the cage nuts on the front rack posts by using a front
mounting bracket.
Figure 4 Marking the positions of the cage nuts
3. As shown in Figure 5, install the cage nuts to the marked positions on the rack posts.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 120 121

Comments to this Manuals

No comments