H3C S12500X-AF Switch SeriesQuick Start Guide Hangzhou H3C Technologies Co., Ltd. http://www.h3c.com Document version: 5PW102-2
6 Table 2 Slide rails available for the switch Switch model Chassis weight (full configuration) Applicable slide rails S12516X-AF 350 kg (771.60 lb)
7 2. Use a slide rail, for example, the right slide rail, to mark the installation position on the rack posts: a. Make sure the top flange of the s
8 Figure 8 Attaching the right slide rail to the right front rack post 5. Keep the slide rail horizontal and adjust its length until the installat
9 Attaching the LSVM1BSR10 slide rails (for the S12504X-AF switch) 1. Read signs on the slide rails to avoid making a mistake. Figure 10 Right slide
10 Figure 11 Marking the installation position on the rack for the slide rails (1) Positioning tab (2) Lowest square hole within the 2U space 3.
11 Figure 13 Attaching a slide rail (1) Compress the slide rail, making sure the positioning tabs are inserted into the square holes (2) Install fas
12 Figure 14 Installed slide rails Installing cage nuts for attaching mounting brackets Before mounting the chassis in the rack, install cage nuts
13 Figure 15 Installing cage nuts (for the S12516X-AF switch) 3U3U3U3U3U3U1U1U1U
14 Figure 16 Installing cage nuts (for the S12508X-AF switch) 2U1U4U2U1U2U
15 Figure 17 Installing cage nuts (for the S12504X-AF switch) Mounting the switch in a rack CAUTION: • Remove fan trays, power modules, and fill
Copyright © 2014-2015, Hangzhou H3C Technologies Co., Ltd. and its licensors All rights reserved No part of this manual may be reproduced or transmi
16 For the S12516X-AF and S12508X-AF switches, the name plate on the upper right corner of the front panel covers two mounting screw holes on the mou
17 Figure 19 Mounting the S12504X-AF switch in the rack (1) Chassis handle (2) Slide the chassis into the rack (3) Use screws to secure the mounting
18 Grounding the switch by using a grounding strip CAUTION: • Use the grounding cable (yellow-green grounding cable) provided with the switch. • C
19 Figure 20 Connecting the grounding cable to a grounding strip (S12516X-AF switch) (1) Use grounding screws to attach the two-hole grounding lug t
20 Figure 21 Grounding the switch by using the PE wire of an AC power module (S12516X-AF switch)
21 Installing FRUs This section describes the installation procedures for the MPUs, LPUs, switching fabric modules, fan trays, and power modules. For
22 7. As shown by callout 5 in Figure 22, fasten the captive screws on the MPU. Figure 22 Installing an MPU (S12516X-AF switch) (1) Loosen the capt
23 Figure 23 Installing an MPU (S12504X-AF switch) (1) Loosen the captive screws and remove the filler panel (2) Pivot up the handle (3) Push the MP
24 Installing S12500-X LPUs Installing an interface module adapter 1. Remove the filler panel from the target slot. See callout 1 in Figure 22. Keep
25 6. Push the ejector levers inward until they come in close contact with the panel. See callout 3 in Figure 26. 7. Fasten the captive screws to s
i Contents Preparing for installation ················································································································
26 Figure 26 Installing an S12500-X LPU (S12516X-AF switch) (1) Push the LPU slowly along the guide rails into the slot (2) Pull the ejector levers
27 2. As shown by Figure 27, orient the LPU with the upside up based on the orientation of characters on the LPU. Hold the LPU by the front panel wi
28 Installing cable management brackets The cable management brackets are installed on the two sides of the LPU slots. H3C recommends that you instal
29 3. Orient the switching fabric module with the side marked "Up" up. Hold the switching fabric module front panel near the ejector lever
30 Figure 30 Installing a switching fabric module (S12516X-AF switch) (1) Push the switching fabric module slowly into the slot (2) Rotate the eject
31 Figure 31 Installing a filler panel in a switching fabric module slot (S12516X-AF switch) (1) Push the filler panel slowly into the slot (2) Simu
32 Figure 32 Removing the filler panel from a switching fabric module slot (S12516X-AF switch) (1) Loosen the captive screws on the ejector levers (
33 • Before you install or replace a switching fabric module on an operating switch, first remove the fan tray. Install the fan tray immediately aft
34 Figure 33 Installing a fan tray (S12516X-AF switch) (1) Align the fan tray with the fan tray slot (2) Fasten the captive screws Installing fan
35 Figure 34 Installing a fan tray for the S12504X-AF switch (1) Align the positioning pin on the fan tray with the positioning hole in the chassis
ii Obtaining documentation ···························································································································
36 Figure 35 Removing a filler panel (S12516X-AF switch) Figure 36 Installing a power module (S12516X-AF switch) Connecting the power cord CAUTI
37 Figure 37 Using a removable cable tie to secure the power cord to the switch (S12516X-AF switch) (Optional.) Installing transceiver modules CAU
38 2. Pivot the clasp of the module up. Holding the module, gently push the module into the slot until it has firm contact with the slot, as shown i
39 Figure 39 Installing a CFP2 module (S12516X-AF switch) Installing a CXP module CAUTION: • Read the following instructions before you install a
40 1. Unpack the CXP module. Do not touch the golden plating of the module. 2. Correctly orient the CXP module and make sure the pull latch is on t
41 Cabling recommendations Routing network cables The cable management brackets are installed on the two sides of the LPU section. H3C recommends tha
42 Routing power cords When you route power cords, take consideration of the layout of the equipment room, including the locations of the power distr
43 Accessing the switch The first time you access the switch you must use a console cable to connect a console terminal, for example, a PC, to the co
44 Verification before login Before you log in to the switch, perform the following tasks: • Verify that the switch has been correctly installed. •
45 ... ...Done. Loading file flash:/S12
1 Preparing for installation ESD prevention To prevent electronic components from electrostatic discharge (ESD) damage, wear an ESD wrist strap and m
46 Obtaining documentation Take the following steps to get latest documents from the H3C website at www.h3c.com. 1. Go to http://www.h3c.com/portal/
47 Index A AC power supply grounding switch by using AC power supply PE wire, 19 access first time switch access, 43 attaching ESD wrist strap, 21 B
48 mounting cage nuts for attaching mounting brackets, 12 power module installation, 35 rack mounting slide rail, 5 switch installation, 3 I install
49 installing cage nuts for attaching mounting brackets, 12 installing CFP2 transceiver module, 38 installing CXP transceiver module, 39 installing
2 Installation tools and equipment No installation tools and equipment are provided with the switch. Prepare them yourself.
3 Installing the switch Switch dimensions Figure 2 S12516X-AF switch dimensions (1) Fan tray handle (2) Mounting bracket (3) Cable management brack
4 Figure 3 S12508X-AF switch dimensions (1) Fan tray handle (2) Mounting bracket (3) Cable management bracket Figure 4 S12504X-AF switch dimensions
5 Rack requirements Table 1 Rack requirements Model Switch dimensions Rack requirements S12516X-AF • Height—931 mm (36.65 in) (21 RU). • Width—440
Comments to this Manuals